BOUSD Summer 2023 Roofing/Waterproof Repair Project
Sites: Arovista Elem School (CLOSED)
Bid Due Date: March 16, 2023 @ 2:00 pm

Contractor to provide all labor and contractor supplied materials as necessary to install the specified roofing systems with owner supplied materials for the listed sites and buildings. (See documents on owner supplied materials - Section 07550)
 
  • Owner reserves the right to not award individual buildings or sites at this time due to budget constraints.
  • Only those companies fully licensed, equipped and experienced in the work being performed, with skilled personnel immediately available and able to obtain necessary materials.  
  • Prevailing Wage Project: Must be registered with the DIR. Work is allowed to be performed on other than regular working hours (Weekend/Nights)
 
The agreement for services will be awarded upon Board of Education approval to a single Bidder who is determined by the District to be the lowest responsive responsible Bidder.  The District at its option, may include the add alternate bid amount in the final award.
 
OC Register Advertisement: 02/27/23 & 03/06/2023
 
-----------------------------------------------------------------------
Foundation/Grading-Laurel Elementary Modular (3) Bldgs. (District Provided)
Project Invitation # 23-0002FOUN (CLOSED)
 
Laurel Elem School site: District provided portable classrooms - Construction of concrete stem walls for three
modular portables, concrete flatwork around the new portables, and joint trench for electrical, low voltage, and
storm drain utilities for portables-performed by others. Must have 5 years prior experiences and provide district
with other school district portable installation(s). DSA Project: Must be able to coordinate with DSA inspector
and Lab of Records vendor: Proof of prior DSA project experience required. Prevailing Wage Project:
Must be registered with the DIR. The agreement for services will be awarded upon Board of Education
approval to a single Bidder who is determined by the District to be the lowest responsive responsible Bidder
based on the total net base bid amount only. The District at its option, may include the add alternate bid
amount in the final award.
OC Register Advertisement: 02/07/23 & 02/14/2023
Bid due on or before February 24, 2023 @ 4:00 pm
-----------------------------------------------------------------------
 
Electrical/Fire Alarm and other Related Wiring-Laurel Elementary Modular (3) Bldgs.
(District Provided) (CLOSED)
Project Invitation # 23-0002ELEC
 
Laurel Elem School site: District provided portable classrooms - Construction of electrical wiring, fire alarm wiring and other related materials/labor for three (3) modular portable
Must have 5 years prior experiences and provide district with other school district portable installation(s).  DSA Project: Must be able to coordinate with DSA inspector and Lab of Records vendor: Proof of prior DSA project experience required. Prevailing Wage Project: Must be registered with the DIR. Work is allowed to be performed on other than regular working hours (Weekend/Nights) The agreement for services will be awarded upon Board of Education approval to a single Bidder who is determined by the District to be the lowest responsive responsible Bidder based on the total net base bid amount only.  The District at its option, may include the add alternate bid amount in the final award.
 
Legal Advertising:  Orange County Register 02/14/23 & 02/21/23
 
Bid due on or before March 1, 2023 @ 4:00 pm
 
 
Foundation/Grading (CUPCCAA)-Falcon Academy of Science and Technology Modular Bldg CUPCCAA Project Invitation # 23-0001FOUN (CLOSED)
 
CUPCCAA Project (Pub. Contract Code Sec 22032(b)) - Construction of concrete stem walls for one modular portable, concrete flatwork around the new portable, and joint trench for electrical, low voltage, and storm drain utilities for portables-performed by others. Must have 5 years prior experience in School District portable installations. (Refs may be solicited) DSA Project: Must be able to coordinate with DSA inspector and Lab of Records vendor: Proof of prior DSA project experience required. Prevailing Wage Project
 
Bid due on or before February 15, 2023 @ 4:00 pm
-----------------------------------------------------------------------
Transportation Services: Home to School SY 2022-23 Bid No. 22-0008 (CLOSED)
 
-----------------------------------------------------------------------
INVITATION FOR BIDS/QUALIFICATIONS (RFQ) (CLOSED)
 
BOUSD Summer 2022 Summer Roofing Projects Project No. 22-0007
Sites: Mariposa ES, Country Hills ES, Brea JHS
Bid Due Date: April 26, 2022 @ 2:00 pm (CLOSED)
-----------------------------------------------------------------------
Mariposa Elementary School Front Parking Lot Asphalt Repair/Resurface CUPCCAA Project 22-0003
Bids can be received at the main lobby of the District Office at 1 Civic Center Cir, 2nd Floor, Brea, California 92821 or via email to [email protected] on or before April 13, 2022 @ 3:00 pm  
Project Withdrawn
-----------------------------------------------------------------------
Olinda Elementary School Asphalt Repair/Resurface CUPCCAA Project 22-0004
Bids can be received at the main lobby of the District Office at 1 Civic Center Cir, 2nd Floor, Brea, California 92821 or via email to [email protected] on or before April 14, 2022 @ 3:00 pm (CLOSED)
-----------------------------------------------------------------------
Brea Olinda High School Generator Replacement CUPCCAA Project 22-0005
Bids can be received at the main lobby of the District Office at 1 Civic Center Cir, 2nd Floor, Brea, California 92821 or via email to [email protected] on or before April 25, 2022 @ 3:00 pm (EXTENDED) (CLOSED)
-----------------------------------------------------------------------
Brea Olinda Jr High School Asphalt Repair/Resurface CUPCCAA Project 22-0006
Bids can be received at the main lobby of the District Office at 1 Civic Center Cir, 2nd Floor, Brea, California 92821 or via email to [email protected] on or before April 25, 2022 @ 3:00 pm (EXTENDED) (CLOSED)
 
BOUSD VOiP Telephone Conversion CUPCCAA Project 22-0002 Due Date March 4, 2022 at 5:00 pm)
The District wishes to update to a VOiP telephone system at 3 elementary sites and district office via an RFP process to match balance of district sites (CLOSED)
 
 
The District wishes to create a pool of architectural firm(s) which it can assign via an RFP process specific projects district-wide. 
 
 
Transportation Services: Special Education Student Services
 
 
Mariposa Elementary School Asphalt Repair/Resurface (Due Date Extended 06/04/21 at 5:00 pm)
CUPCCAA Project (CLOSED)
 
Falcon Elementary School Asphalt Repair/Resurface (Due Date Extended 06/04/21 at 5:00 pm)
CUPCCAA Project (CLOSED)
 
Transportation Services: Home to School (CLOSED)